Moment Capacity of Slabs with Base Reinforcement

Moment Capacity of Slabs with Base Reinforcement

In this video, the calculated moment capacity of a slab with base reinforcement, as well as the cover requirements for base reinforcement are reviewed.

You may also be interested in

 
ADAPT-PT/RC Version 21.0 is now available!
NOVEMBER 17, 2021

ADAPT-PT/RC Version 21.0 is now available!

New Design Code: AS3600 - 2018 ADAPT-PT/RC has been updated to include the latest Australian - AS3600 (2018) concrete design code. The provisions...

Read More
Detailed Calculation Report for Minimum Required Reinforcement
NOVEMBER 21, 2022

Detailed Calculation Report for Minimum Required Reinforcement

Users can now generate an Excel spreadsheet for each design section showing a summary of the design section properties, reinforcement, and...

Read More
User Defined Maximum DCR in ADAPT-Builder
MAY 24, 2022

User Defined Maximum DCR in ADAPT-Builder

ADAPT-Builder has historically been hard coded to design reinforcement for strength load combinations to a maximum demand/capacity ratio of 1.0....

Read More