Decommissioning a nuclear facility requires precision, planning, and advanced structural analysis. At the West Valley Demonstration Project (WVDP) Phase 1A, American DND engineers faced the challenge of safely dismantling heavily reinforced structures—some with walls up to five feet thick—without risking premature collapse.

By leveraging RISA-3D, the team modeled structural integrity, optimized demolition sequences, and ensured on-the-fly safety adjustments during active deconstruction. Their innovative approach transformed a high-risk demolition into a controlled and predictable process.

To learn more visit the project case study page:

👉 WVDP Phase 1A - Decommissioning

WVDP Phase 1A - Decommissioning

 

You may also be interested in

 
Case Study: SCC Beatrice Academic Excellence Center
JUNE 14, 2022

Case Study: SCC Beatrice Academic Excellence Center

Learn how Olsson utilized the entire RISA Suite (RISA-3D, RISAFloor,...

Read More
Case Study: US Olympic & Paralympic Museum
OCTOBER 06, 2020

Case Study: US Olympic & Paralympic Museum

Learn how KL&A utilized RISA to model and analyze the complex...

Read More
Seismic Brace Connection Integration with RISA-3D
JUNE 28, 2016

Seismic Brace Connection Integration with RISA-3D

RISAConnection version 6.0 has introduced the ability to design...

Read More